Problems
- WSS failure in India is not due to single reason.
- Numerous reasons form a Vicious cycle of WSS failure in India.
Opportunities
- Rural part of India – 18% household connections.
- Urban part of India – 64% individual and stand post connections.
- Supply hours – 1 to 6 hours, NRW – more than 50%.
- Government of India, has launched National level missions like Jal Jeevan Mission (Rural and Urban) and AMRUT-2.
Main competition and their limitations
- The existing design consultants, which provide routine solutions for improvement in water management.
- The solutions are suitable for developed countries, high O&M cost.
- Based on thorough understanding of field conditions and operational hydraulics, we will be providing low-cost interventions for improving WSS, which will be suitable in the Indian context and many other such countries with the same socio-economic conditions.
- Shaft, Multi outlet storage tanks, Manifold, Pipe in pipe.
- Holistic approach will be adopted to improve efficiency of WSS in India
Following tasks will be done by the proposed company
- Studying the existing city water supply system and field measurements in a unique approach.
- Analyzing the city water supply systems with unique hydraulic modeling analysis.
- Fabrication of low-cost interventions and implementing them.
- Operation of the water supply systems after implementation of solutions with a new schedule.
- Documenting the post-performance.